⚠️Sidewalk Construction at OLP January 12-16
**Please be advised that construction on the parish sidewalks will begin Monday, January 12th and continue through most of the week. This work is necessary to repair broken, uneven, and cracked sidewalks, ensuring safety and ease of access to the church for everyone.
During construction:
  • Please park in the main parking lot and enter and exit the church via the asphalt walkway, going past the garages to the church door by the playground (choir side of the church).
  • Sidewalks from South Street to the church will be blocked off.
  • If you need to visit the rectory, please call ahead before coming in. 908-464-7600.
  • The main parking lot exit will still be accessible. You may drive over the yellow caution lines as needed.
  • Construction schedules may change throughout the week. We will try to post any updates on social media.
  • For food pantry visitors, please check the parish Food Pantry Facebook page before coming.
Thank you for your patience during this process as we make these improvements for everyone’s safety!
Place Facebook Instagram Instagram Stroke Youtube Email Phone Arrow Youtube Color Calendar Information